When we were approached by a secondary school in Sheffield, the facilities team had a clear objective: they wanted to improve their existing Multi-Use Games Area (MUGA) without losing valuable outdoor space or disrupting the school's sporting timetable.

The court had been in regular use for several years, accommodating PE lessons, lunchtime activities and extracurricular sports clubs. However, the existing macadam surface was beginning to show its age.

Sections of the court had lost their original colour, the line markings were becoming difficult to distinguish, and several areas had developed minor surface defects.

During our initial conversation, the school's PE coordinator explained that the facility was used for basketball, netball, football and general fitness activities.

Their main concern was that the court no longer provided the standard of playing environment they wanted for pupils.

Rather than constructing an entirely new facility, the school asked whether the existing MUGA could be refurbished.

Following our site assessment, we recommended a programme of localised repairs, specialist sports surface coating and new multi-sport line markings.

Understanding What the School Needed

Before agreeing on the final specification, we met with the school's site manager and PE department to discuss how the facility was used.

One of the teachers explained that pupils sometimes struggled to identify the correct court markings because several of the original lines had faded into the surrounding surface.

The school also wanted a more modern appearance, but it was important that the colours remained practical for multiple sports.

We suggested a two-tone court design, using a contrasting central playing area and perimeter zone.

Different coloured line markings would distinguish the basketball and netball layouts, with additional markings for the school's other activities.

We also discussed the existing fencing and drainage arrangements.

The fencing remained serviceable, so the school decided to retain it rather than include unnecessary replacement work.

Our inspection found that the underlying macadam was generally suitable for refurbishment, although several damaged sections required attention before the new coating could be applied.

The agreed programme was scheduled for approximately seven working days, with additional curing time before the court returned to use.

Preparing the MUGA for Refurbishment

We began by securing the work area and checking access arrangements with the school.

Because the project took place during a planned period of reduced site activity, we were able to organise deliveries and equipment movement without interfering with normal PE lessons.

The first two working days focused on surface preparation.

We removed accumulated debris, treated areas of biological growth and thoroughly cleaned the existing macadam.

Once the surface was clean and dry, we inspected the court again to identify cracks, loose material and localised defects.

Damaged areas were repaired using materials compatible with the existing construction and proposed coating system.

We also checked that drainage outlets were clear and that no significant standing-water issues needed to be addressed.

This preparation was essential because applying a new sports coating over an unstable or contaminated base could compromise the quality of the refurbishment.

Applying the New Sports Surface Coating

With the repairs complete and the substrate ready, we moved on to the specialist court coating.

The selected system was designed for the existing macadam surface and the school's intended sporting activities.

Our installers applied the coating in accordance with the manufacturer's requirements, allowing the appropriate drying time between applications.

The new colour scheme immediately changed the appearance of the MUGA.

The school had chosen a blue central court with a contrasting green surround, creating a clear distinction between the main playing area and the outer sections.

During the coating stage, the PE coordinator visited to check progress.

They were particularly pleased with the way the contrasting colours defined the space and commented that it would make supervising different activities much easier.

We explained that the line markings would be added once the coating had dried sufficiently and that the court would need to remain closed until the complete system was ready for use.

Accurate Multi-Sport Line Marking

The final installation stage involved setting out and applying the new court markings.

We measured the relevant layouts carefully and checked them against the agreed drawings.

Basketball and netball markings were applied in contrasting colours so that pupils could identify the correct boundaries for each activity.

We also incorporated the additional markings requested by the PE department.

Accuracy was particularly important because the facility was used for structured lessons and organised school sports.

The line marking process took approximately one working day, including setting out and application.

Once the markings had dried, we completed the final inspection and prepared the facility for handover.

Project Timeline and Completion

The refurbishment was completed over approximately seven working days on site.

The programme included:

  • Two days for cleaning, preparation and localised repairs.

  • Three days for coating preparation, application and drying intervals.

  • One day for setting out and applying the sports markings.

  • One day for final checks, minor finishing work and handover preparations.

The exact drying and curing periods depended on the coating manufacturer's requirements and the weather conditions during installation.

We advised the school to keep the court closed until the specified curing period had passed.

Fortunately, the weather remained suitable throughout the project, allowing us to complete the planned work without any significant delays.

The Outcome: A More Practical Multi-Sport Facility

The finished MUGA provided the school with a refreshed outdoor sports area without the expense and disruption of a complete reconstruction.

The new surface coating improved the court's appearance, while the clearly defined line markings made the different sporting layouts easier to identify.

By repairing the damaged areas before applying the coating, we also addressed the visible defects that had prompted the school to consider refurbishment.

At handover, the site manager was pleased that the project had been completed within the agreed programme.

The PE department was particularly enthusiastic about the improved layout and the opportunities it provided for organising lessons and extracurricular activities.

We finished by discussing routine maintenance, including regular cleaning, removing debris and checking the surface for developing defects.

For our team, the project demonstrated how a carefully planned MUGA refurbishment can make a substantial difference to an existing school sports facility.

Looking to Upgrade a School MUGA?

We help schools, colleges, leisure centres and community organisations explore MUGA installation, resurfacing, repairs and line marking services across the UK.

Whether your existing sports court has faded markings, worn surfacing or localised damage, we can discuss suitable refurbishment options based on its condition and intended use.

Contact our team today to request a quotation and find out how we can help improve your outdoor sports facilities.